Completed Project



Project  :  Q- Sentral, Lot B






Project :  Lot D, KL Sentral (2 Blocks of 57 Level of Commercial Building & 5 Level of Basement parking, Tower A & Partially of Tower B) - Works Duration: 2014 ~ 2017












Project  : KL Sentral































Project  : Novum South Bangsar






Project :  MCT One City







Project  : 47+53 Bungalow @ Kota Kemuning





 Project :  Menara Klang Lama

 























Project :  Menara HSBC Quill Building 6 






Project :  Garden Plaza, Cyberjaya










Project  : Ativo Suites  - Work Duration (2020-2021)
  • Architectural work




     Project: Aetas Damansara





     Project: Cybersouth @ Casa Bayu Dengkil
  • Structural work





   Project: Hemmon house 40 Floor Service Apartment Project
  • Architectural work







      
Project : Santuari Park Pantai 
  • Brickwork, Plaster, Skim Coat 





 



Project  : SOVO IOI, Puchong  - Work Duration (2019-2021)
  • Architectural work

















Project  : 48 Unit Terrace, Alam Impian - Work Duration (2020-2021)
  • Structural Works
 















          
      Project: Tropicana Aman
    • Structure work & Architectural work




                                                                                    



          





Project  : Tropicana Kajang PH5 - 66 Units Terrance - Work Duration (2018-2020)
  • Structural work





Project  :  26 units, Semenyik
  • Architectural Works





Project  : 8 Units Shoplot, Denai Alam











Project  : Jade Hill Kajang (66 units Shop-lot)






Project  :  Q- Residences




Project  :  37 Units 3-Storey, Terraced House (Tropicana Cheras @ Sg Long )







Project  :  Sunway Mont Residence






Project  :  32 units Semi-D @ Kota Damansara
  • Plastering works

















Project  :  Bently Music, Damansara










Project 78 Units Double Storey Terrace At Mukim Rawang





Project 54 Units 3 Storey Terrace House At Segambut



Project 64 Units Double Storey Terrace House At Cheras 




Project 38 Units Semi D At Cheras 




Project :  Sierramas At Sungai Buloh





Project 290 Units Of Condominium At Petaling Jaya














Project :  3 Block Residence At Sungai Besi Camp






Project :  PJ SS2 Mall Shopping Central







Project :  Digi Telecommunication 


  
      







Project  :  Jade Hill 4B   

  

  




Project  :  40 Units 3 Glover Semi-D at Cyberjaya   



    
  
  





Project  :  168 Units Double Storey at Section 16 Shah Alam

        












Project  :  14 Units 3 Storey Terrace House at Cyber 9

   




Project :  Jaya One, Petaling Jaya









Project :  43 units Shop Lot, Rawang












Project :  Pusat Asasi UiTM Dengkil, Sepang, Selangor














Project :  104 Units & 115 units Double Storey Terrace House








Project :  83 units Double Storey, Semi-D Terrace House







Project :  192 units Double-Storey Terraced House (Phase 2B, Eco Majestic)




Project :  122 units Double-Storey Terraced House (Phase 2D, Eco Majestic)






Project :  Lakefront Villa (Tiling & Marble Works only)







Project 78 units Double-Storey Terraced House at Cyberjaya - Works Duration: 2016 ~ 2017




Project Paramount Utropolis Phase 2A (Formwork, Concrete, Reinforcement Bar, Brickworks, Plastering & Rendering) - Works Duration: 2015 ~ 2017




  

Project Paramount Utropolis Phase 2B Service Apartment (Plastering & Rendering) - Works Duration: 2016 ~ 2017






Project Nirvana Block (Memorial Centre) - Works Duration: 2016 ~ 2018











Project SEKITAR 26 - Substructure & Superstructure Works (8 Blok Pusat Perdagangan / Pejabat 2 Dan 3 Tingkat Tempat Letak Kereta) - Works Duration: 2017 ~ 2018